Digging Permits
The University has an extensive system of campus utilities into which most projects are connected. Other, non-University, entities also have a number of utility lines on campus. As a result, a University Digging Permit is required before any digging may occur on campus. Contractors should request digging permits through their project manager. More...
Inspections
All construction work must comply with the contract documents and the International Code Council family of codes and State of Utah amendments as approved by the Uniform Building Codes Commission. More...
Locating Utilities
All contractors are required to obtain a University Digging Permit as well as contact Blue Stakes and other utilities for marking of underground utilities to digging. More...
Parking
Parking at the University is limited at best. The project manager will arrange for staging areas as appropriate to the project. You will be able to purchase parking passes at designated lots for the duration of your work. More...
Permits
As a state entity, University projects constructed on its property are not subject to municipal building permit requirements. More...
Utility Shutdown
The University has an extensive system of campus utilities into which most projects are connected. A Request for Shutdown is required whenever a shutdown is required including any time connections are made to any utility such as electric power and communication lines; gas, water, distilled water, steam and high-temperature water lines; and sanitary sewers or storm sewers. More...

Contact Info

Business Services

  • 801-581-4707
  • fax: 801-581-6081

Construction Project Delivery


Campus Planning
  • 801-581-3135
  • Fax: 801-581-6081

Lenard Barney

  • Surveyor
  • office: 801-585-5070
  • fax: 801-581-6081
  • Send email